The restoration works of the building were carried out in 2001 under the supervision of the Ministry of Culture of Greece as it is characterized a building protected by National Architectural Heritage Preservation Law.
In the original form, the snake’s head shaped outlets of the roof gutters were placed at the top of the roof. Gutter extensions had to be built to place this outlets at the pavement level to avoid splashing water from a great height. A small detail in the interventions done on this building that offer functionality, while respecting the aesthetics of the original design.
Patras, Greece
Reinforcement, Repair
Completed on 1998










This impressive church is located in the northern part of the city of Patras. The construction of the temple began in 1983 and lasted until 1985. The decoration of the Temple was completed with the outer cladding of stone carved by hand, using traditional methods and using specialized tools.
Patras, Greece
Construction, Decoration
Completed on 1985
A Temple worthy of the history of Galaxidi region. Construction began in 2002 and was completed in 2004
Galaxidi, Greece
Construction
Completed on 2004